Magician Risk Assessment
| Hazard |
People at risk |
Action taken |
Notes |
| Trapped fingers, bumps, knocks and scrapes when setting up |
Children |
Keep children away when setting up. Do not allow children “back stage” or to assist with props |
|
| Electric shock |
Performer and assistants |
Carry out visual check on electrical equipment before use. Do not perform with bare wires, faulty plugs etc. Do not permit liquid near the electrical equipment |
|
| Injury caused by falling objects |
Staff and public |
Ensure backdrops, tables and props are secure. Do not allow staff and public into the performance area unless invited by the magician |
|
| Choking |
Younger children |
Do not give small prizes, balloons, or objects to children under the age of three |
|
| Internal ruptures caused by inflating balloons by mouth |
Balloon Modeller |
Always use a balloon pump to inflate balloons |
There is serious danger of injury by inflating balloons by mouth. This practice is not recommended by manufacturers |
| Tripping and falling |
Public and entertainers |
Keep area tidy. Store boxes and bags neatly without risk of them falling or being walked into. Keep walk ways clear. Do not lay cable in walk ways unless covered or taped down |
Event organiser must ensure the performers have an enclosed, dedicated space to work in |
Magician Method Statement
| Equipment and materials |
Method |
| Magic props (such as hat, wand, etc.) |
Due to the improvisational nature of entertainment and the personal style of different magicians, a one-size-fits-all method statement cannot be described for this service. However, the general course of events may transpire as follows:
The Magician arrives at the venue in costume and with equipment and materials to hand. They set up the equipment and prepare for the magic show in the space designated by the client. The magic show begins at the start time as stated in the booking contract. Depending on the type of show the magician delivers, guests may be asked to participate in some of the tricks. The magician will fulfill any special requests previously agreed with JoJoFun and the client, such as pausing the show for happy birthday to be sung. The magic show and special requests are undertaken in accordance with the entertainment duration agreed in the booking contract. When the entertainment duration is complete, the magician packs away their equipment and materials and leaves the venue still in costume so as to maintain the illusion for the children. |